|
| HMNZS Canterbury (L 421):
The construction of the MRV was sub contracted-out to Merwede Shipyards in the Netherlands by Tenix Shipyards in Williamstown, Melbourne, with the design based on the commercial RoRo ship Ben my Chree. However, the choice of a commercially based design has been criticised after the ship was delivered, as it placed several limitations on the functionality of the ship in rough seas – rather than the coastal environment for which Ben my Chree was designed. The keel was laid on 6 September 2005 and the MRV was launched successfully on 11 February 2006. The ship completed initial sea trials in the Netherlands and arrived in Australia in late August 2006 for fit-out with military equipment. Final acceptance was delayed due to alterations to the ship’s hospital and late delivery of documentation. There were also ongoing concerns, negotiations and redesign activities regarding her performance in heavy seas, doubts about which had already been thrown up during her initial journey to Australia, and in fact, even before actual construction. The MRV was accepted by the New Zealand Government on 31 May 2007 and commissioned on 12 June 2007 in Port Melbourne, Australia by the Prime Minister of New Zealand, Helen Clark. The ship cost NZ$130 million to construct. She was constructed with an ice-strengthened hull to allow her to operate in the subantarctic waters, where New Zealand claims several islands, and where Canterbury is to assist scientific expeditions. The vessel was plagued by problems since delivery, having been involved in a number of incidents and being considered less seaworthy than specified. It was estimated in 2008 that at least another NZ$20 million would have to be spent to achieve the sought-for operational abilities. Operational history: Initial exercises and operations: In September 2007, Canterbury embarked 250 troops and 50 vehicles, including 20 NZLAV armoured vehicles, to test embarkation and disembarkation procedures. AU-NZ disaster relief response force: Coincidentally, the newly appointed disaster-relief ship was in the port of Lyttelton less than two weeks later during the devastating February 2011 Christchurch earthquake. The crew provided meals for 1,000 people left homeless in that town, and accommodation for a small number of locals. 2012 Kermadec Islands eruption and pumice raft: 2016 Kaikoura earthquake: Facilities: Cargo: The indicative cargo would encompass (as one possible loadout): 14 Pinzgauer Light Operational Vehicles, 16 NZLAV light armoured vehicles, 7 Unimog trucks, 2 ambulances, 2 flatbed trucks, 7 vehicle trailers, 2 rough terrain forklifts, 4 ATV-type vehicles and up to 33 20 ft TEU containers. The ship is equipped to embark up to eight containers of ammunition and up to two with hazardous materials, and also has an extensive fire sprinkler system. Landing craft: The LCMs can be loaded from either of Canterbury’s two 60 tonne cranes or via the stern ramp. To aid stern ramp loading, the MRV is fitted with Flippers to ensure that the LCM are aligned with the MRV. A ballasting system is fitted to allow for safe operations during loading. Once loaded, the LCM can conduct over-the-beach landings, with the boats mainly intended to be able to access beaches in the Pacific where no port facilities are available, for example during humanitarian missions. Helicopter facilities: Medical: Others: |
from JCs Royal New Zealand Navy https://ift.tt/LKlDSox
via IFTTT
Discover more from JCs Royal New Zealand Navy Ships and New Zealand Defence, Also other World Defence Updates
Subscribe to get the latest posts sent to your email.

























